AustriaEnergy, active in Chile since beginning 2013, has developed more than 700 MW photovoltaic in seven projects. The Company is also developing one wind project of 120 MW. At present three projects are under operation (300 MW), two projects are under construction (200 MW), while the others are under preparation to start the construction.
Project | Status | Capacity (MWp) |
---|---|---|
#5014 - Photovoltaic | Sold to SOJITZ, in operation | 103 |
#5026 - Photovoltaic | Sold to OPDE, under construction | 104 |
#5027 - Photovoltaic | Sold, preparation for construction | 104 |
#5035 - Photovoltaic | Sold to TOTAL, in operation | 110 |
#5040 - Photovoltaic | Sold, under construction | 86 |
#5042 - Photovoltaic | Sold, starting operation | 87 |
#5044 - Wind | Development, preparation for construction | 120 |
#5045 - Photovoltaic | Preparation for construction | 153 |
#5060 - Hydrogen | Development | 1830 |
The Ragusa 1 project (2010) is localized in Sicily, Ragusa province, in Santa Croce Camerina municipality. The total power is 8,4 MWp, realised installing approximately 112.000 First Solar modules and 8 SMA inverters. The modules are mounted over fixed structures and is connected to the grid through a 1.8 km line.
The Resiné project (2011) is localized in Sicily, Ragusa province, in Vittoria municipality. The total power is 9,5 MWp, realised installing approximately 127.000 FIRST SOLAR modules and 8 SMA inverters. The modules are mounted over fixed structures and is connected to the grid through a 1.0 km line.
In Andalusia and Extremadura (2006-2008) the Group has developed and built under EPC modality various PV plants on roof, with a single power up to 400 kW, totalizing 1,1 MWp.
The Almería project (2007) has a total power of 500 kWp. It was built in 3 different phases, joining polycrystalline and monocrystalline technologies over fixed structures and suntrackers.
The Extremadura project (2007) has a total power of 7,1 MWp, it was built in 2 different stages of 1,1 and 6 MWp, with fixed structures.
Should you have any enquiries, require further information or if there is anything else we can do for you, please get in touch with us.
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
Sold in full, located in Copiapó commune and province, Atacama’s Region. Currently in preconstruction phase, 104 MWp and 100 MW in AC. Annual production of 298,857 MWh, 158,394 tons per year of avoided CO2, connected to the 220kV Carrera Pinto substation.
Google MapsSold to SOJITZ, 103 MWp, 98 MW in AC, located in Pozo Almonto, Tarapacá Region, with an annual production of 269,037 MWh, 142,589 tons per year of avoided CO2, interconnected at 220 kV in San Simón substation.
First wind development of AustrianEnergy, located at Ancud, Chiloé province, Los Lagos’s Region. Currently in the final stage of development, 117.6 MW, 390,153 MWh of annual production, 206,802 tons per year of avoided CO2, interconnected to the 220 kV Nueva Ancud substation.
Located in La Higuera commune, El Elqui province, Coquimbo’s Region, sold in full, 87 MWp and 84 MW in AC. Currently under construction, annual production of 228,511 MWh, 121,110 tons per year of avoided CO2, connected to the 220kV Don Héctor Substation.
Sold in full, located in Chañaral commune and province, Atacama’s Region. Currently under construction, 86 MWp and 80 MW in AC. Annual production of 231.856 MWh, 122.884 tons per year of avoided CO2, connected to a switchyard substation, in proximity of the 110 kV Flamenco-Manto Verde line.
Google MapsSold to OPDE and currently under construction, located in Diego de Almagro commune, Chañaral Province, Atacama’s Region. 103 MWp, 100 MW in AC, with an annual production of 288,300 MWh, 152,799 tons per year of avoided CO2, connected to a 110 kV switchyard substation.
Google MapsSold in full, 110MWp, 100 MW in AC, located in La Higuera, El Elqui Province, Coquimbo’s Region, with an annual production of 298.117 MWh, 158.002 tons per year of avoided CO2, interconnected at 220 kV in Don Héctor substation.
Located in La Higuera municipality, Elqui province, Coquimbo’s Region. Fully authorised, the construction will start Q1/2021. 153 MWp and 141 MW in AC, annual production of 415.464 MWh, 220.196 tons per year of avoided CO2, interconnected to 220 kV La Huella substation.
Google MapsRegion of Magallanes. The project will produce ~850.000to/year green hydrogen or ~150.000to/year green ammonia for export and avoids 2,3 millions to CO2. It is expected to start operation by 2025.